IMEG was engaged by a leading manufacturer of industrial enclosures and accessories to improve the consistency and efficiency of their kitting operations. Faced with irregular picking times, inconsistent labor performance, and a lack of standardized work, the client needed a structured approach to define MTM time standards and ensure uniform productivity across their workforce.
IMEG applied MTM methodology and travel time analysis, IMEG built a repeatable system to improve efficiency and labor predictability to standardize and optimize the kitting process:
IMEG’s structured MTM development initiative delivered impactful results: