BOTTLENECK REDUCTION CAPACITY ANALYSIS

PROJECT INCLUDES:

Capacity Planning

A leading industrial spring manufacturer was struggling to keep up with growing demand and maintain on-time delivery. To improve efficiency, they hired IMEG to perform a capacity utilization analysis to identify bottlenecks, optimize production flow, and increase throughput.

THE PROBLEM

capacity planning

THE PLAN

THE RESULTS