IMEG was hired by a leading manufacturer of high-quality lighting pole products to assist with re-analyzing machine capacities after the removal of a piece of equipment, and predicting capacity 5 years in future production.
THE PROBLEM
Determining how to reallocate volume from the removed piece of equipment to other machines
After initial analysis, capacity needed to be updated due to variation of shift durations
THE PLAN
Use previously created capacity models, made by IMEG team, for reallocation analysis, reallocating based on product grouping
Analyze updated capacity utilization to predict capacity 5 years out with 3% increase per year
THE RESULTS
Capacity Utilization after reallocation of volume kept overall capacity under 100%
This reallocation ensured that the piece of equipment could be effectively decommissioned without any loss of production capacity
Updated capacity utilization sheets to an interactive tool, allowing the management team to adjust shifts per day, hours per shift, etc.
The interactive capacity tool also allows a very accurate representation of how the production floor should be running at all times